Top 6 Variables That Influence the Cost of a Silent Energy Mobile Solar Generator Project
- kmarcoux3
- May 11
- 2 min read
Investing in a mobile solar generator is not just about picking a standard model. At Silent Energy, every trailer is custom-built to fit the unique energy needs of our clients. Here are the six main factors that influence the cost of such a project.
1. Battery Stack Capacity
Energy storage is one of the biggest cost drivers. The more autonomy your operations require, the more powerful the battery system must be. Silent Energy offers various battery capacities—20 kWh, 40 kWh, and 100 kWh—tailored for specific industries like outfitting camps, mining operations, or large-scale events. A higher capacity also requires scaled components like Volthium batteries and Victron inverters.
2. Number and Configuration of Solar Panels
The number of panels directly impacts daily charging capacity. A larger setup may cost more upfront but can lower the cost per installed watt thanks to economies of scale. Configurations that include bifacial panels and tiltable supports (up to 85°) increase efficiency and shorten the return on investment.
3. Deployment and Installation Logistics
Not all sites are created equal. Narrow, uneven, or hard-to-reach locations may require additional equipment like a skytrack or adjustable stabilizer legs. Silent Energy systems are designed for plug and play installation, but terrain constraints can lead to extra logistics or equipment costs.
4. Project Energy Requirements
Correct sizing starts with a thorough analysis of your energy profile. An inaccurate estimate can lead to:
Oversizing, which drives up unnecessary costs
Undersizing, which reduces autonomy and reliability
Silent Energy offers technical consultation services to assess peak power, daily usage, and load profile to recommend the optimal configuration.
5. Total Energy Demand Over Time
Your daily or weekly energy demand (in kWh) determines not only the size of the battery pack but also the solar charging capability. Higher demand requires a more robust system to ensure stable power, even during cloudy days. That could mean more panels, more batteries—or even a backup generator.
6. Project Location and Terrain Conditions
Sunlight exposure, weather, road access, and terrain slope all influence cost and system performance. For example:
Sloped or rocky terrain may require custom supports.
Remote sites increase logistical and transportation costs.
Proper panel layout is also essential for optimal solar gain based on latitude and seasonal variation.
Conclusion
Each project is unique. These six variables should be considered early in the planning process to ensure a high-performing, durable, and cost-effective system. At Silent Energy, we work closely with each client to design the best-fit solution—whether it’s through a purchase, rental, or lease-to-own model.
Speak with an expert today to get a quote tailored to your project: silentenergy.ca

Comments